4 May 2024
Endesa books more capacity at Chile's Quintero LNG terminal
Publication date: 27 September 2013
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Endesa has called for the rapid expansion of its the GNL Quintero (GNLQ) LNG terminal as the Spanish utility looks in the short term to boost its regas capacity at the plant from the current 0.5 MMcm/d to 1.6 MMcm/d on growing demand for gas at Endesa’s gas-to-power plants.