Copyright © 2024 Gas Strategies Group Ltd. All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form
or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher.
If you would like to distribute this content please contact the Editorial team at Gas Strategies.
- Azerbaijan’s Shah Deniz 2 project and TANAP pipeline start operations but TAP still faces obstacles in Italy
- Further major increase in Azeri exports in doubt
- Caspian accord does not solve Turkmen gas routing problems
- Southern Corridor’s position as a prospective major European gas supplier on the wane