Copyright © 2024 Gas Strategies Group Ltd. All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form
or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher.
If you would like to distribute this content please contact the Editorial team at Gas Strategies.
Contents
-
LNG BRIEFING: Magnolia LNG, Cove Point LNG, Cheniere
Publication date: 26 April 2016
;
- Magnolia LNG extends its USD 4.35 billion price estimate for its project's EPC contract to December 2016
- Cove Point LNG retains permission to export from Oregon after US authorities an objection by the Sierra Club
- Cheniere signs deal for Pine Prairie Energy to provide 8 Bcf of gas storage for Sabine Pass LNG from 2018-2028