1 May 2024
FERC runs environmental rule over Jordan Cove LNG
Publication date: 14 June 2017
Gas Strategies Group
10 Saint Bride Street
London UK
EC4A 4AD
ISSN: 0964-8496
Twitter @GasStrategies
Editorials
Subscriptions
Veresen is inching towards a long-coveted construction permit for its 7.8 mtpa Jordan Cove LNG project in Oregon with the US Federal Energy Regulatory Commission preparing an environmental impact statement for the scheme.
The EIS marks the start of scoping and public consultation on Veresen’s plans for the Coos Bay export facility, which was redesigned following two previous rejections by FERC in 2016.
FERC will use the EIS to re-examine whether ...